Great Shelford · 2025 · Bathrooms
A Great Shelford principal suite
A principal bathroom suite carved out of a former box room — Calacatta marble, brass brassware, walk-in shower.

Location
Great Shelford
Year
2025
Size
12 m²
Duration
8 weeks on site
The project
Reconfiguring a principal bedroom in an Edwardian Great Shelford house to absorb the adjacent box room and create a full principal suite — bedroom, dressing room, bathroom.
The bathroom itself runs the full width of the rear elevation, with a freestanding bath under the window, a walk-in shower with a single fixed glass screen, and a twin basin vanity in honed Calacatta.
Scope of works
- Structural reconfiguration — wall removal and new doorways
- Walk-in shower with low-iron glass screen
- Freestanding bath, twin basin vanity
- Honed Calacatta marble floor and walls
- Underfloor heating, towel rail circuit
- Brushed brass brassware throughout
Materials
- Honed Calacatta marble
- Brushed brass brassware
- Walnut vanity joinery
More work
Other projects in Cambridge.
Newnham · 2024
A Newnham rear extension
A 42m² rear extension to a Victorian semi — Crittall steel, polished concrete and a London stock spine wall.

Trumpington · 2024
A Trumpington kitchen
A hand-painted, in-frame kitchen with honed limestone worktops and an Aga in the original chimney breast.

Histon · 2024
A Histon garden studio
A 22m² insulated garden studio in larch and zinc — full electrics, double glazing, year-round office space.
